Do you handle permits and inspections?

John Kraja, Qualifying Contractor
John (Genti Kraja) Master Qualifier • CGC1517295 / CCC1329271
8 Min Read
Updated October 2026

In South Florida, executing construction or roofing work without municipal permits is illegal, invalidates property insurance policies, and triggers severe stop-work orders and daily code enforcement fines. Handling permits is not an optional add-on—it is the foundation of structural compliance. At Planet Construction, our in-house permitting division manages 100% of the permitting and mandatory inspection lifecycle directly under John Kraja's active state qualifiers (CGC1517295 & CCC1329271). Here is exactly how our process works.

Executive Briefing • Key Takeaways

Florida Code Verified
  • Planet Construction pulls all permits directly under qualifying contractor John Kraja—we never use third-party permit-pulling brokers.
  • We handle all municipal submittals across Broward, Miami-Dade, and Palm Beach building departments, including Notice of Commencement (NOC) filings.
  • Every project phase undergoes strict municipal in-progress inspections (framing, secondary barrier, fastening, threshold) culminating in a final Certificate of Completion (CC/CO).
  • Unpermitted work creates severe title defects, halts property sales, and can cause insurance carriers to deny storm damage claims entirely.
In This Guide: Jump to Section

Why Direct Permitting Matters: Eliminating the "Paper Broker" Risk

In South Florida's construction landscape, an alarming number of sales outfits operate as "paper contractors." These entities lack their own certified qualifiers, instead renting licenses from retired builders or hiring third-party "permit expediters" who have no presence on the physical jobsite.

When you hire Planet Construction, your permit is pulled under Genti Kraja (John), holder of Florida Certified General Contractor license CGC1517295 and Certified Roofing Contractor license CCC1329271. The qualifier whose name is recorded with the city or county building department is the exact builder inspecting your jobsite and meeting the municipal building inspector in person.

Our 6-Step Municipal Permitting & Inspection Lifecycle

From initial architectural review through the issuance of your official Certificate of Completion, we handle every administrative and engineering milestone:

Step 1: Engineering Review & NOA Compilation

We compile stamped engineering calculations, wind-uplift test reports, architectural schematics, and official Florida Product Approvals / Miami-Dade Notices of Acceptance (NOAs) for every material used.

Step 2: Notice of Commencement (NOC) Filing

Under Florida Statute § 713.13, any project valued over $2,500 (or $5,000 for HVAC/roofing) requires a recorded NOC. We prepare, notarize, record the document with the County Records division, and post it prominently on site.

Step 3: Building Department Plan Review & Permit Issuance

We submit package documentation directly into municipal electronic plan review portals (e.g., Fort Lauderdale, Hollywood, Pompano Beach, Boca Raton, Miami-Dade ePermitting), answer plan examiner comments, and secure the approved building card.

Step 4: In-Progress Rough Inspections

Depending on scope, municipal inspectors must verify work before it is covered. Examples include roof deck re-nailing (6-inch fastener spacing), self-adhering secondary water barrier underlayment, rebar replacement in structural concrete, and framing anchors.

Step 5: Final Engineering & Municipal Inspection

Upon construction completion, John Kraja or our field project managers walk the site with the municipal building inspector to review finished assemblies, edge flashing, drainage, and safety protocols.

Step 6: Closed Permit & Certificate of Completion

We provide you with the official municipal sign-off and closed permit documentation, which is vital for insurance premium discounts, clear title transfers, and association records.

The Devastating Costs of Unpermitted Construction in Florida

Some property owners are tempted by unlicensed handymen offering to perform roof replacements or concrete repairs "off the books" to bypass municipal permit fees. In Florida, this gamble carries severe repercussions:

  • Zero Insurance Coverage: Property insurance carriers can legally deny claims for storm damage or water intrusion if forensic investigators discover the roof or opening was installed without an approved municipal permit.
  • Double Permitting Fines & Code Enforcement Liens: Building departments assess up to 400% in penalty fees for unpermitted construction and can place encumbering liens on the property title.
  • Mandatory Destructive Testing: If a city red-tags unpermitted work, they frequently require the owner to hire a structural engineer to cut open finished walls or tear off completed roofing layers to inspect concealed fasteners.
Direct Qualifier Access • No Middlemen

Have Questions About an Upcoming Project?
Speak Directly With Our Qualifier

Skip the broker runaround and call center gatekeepers. Speak directly with Genti (John) Kraja, qualifying master builder and roofing contractor of record for Planet Construction. We provide engineering feasibility evaluations, code guidance, and itemized bids across South Florida.

No call center. No sales rep. Real answers directly from the license qualifier.

24/7 Roofing & Leak Dispatch Text
954-600-1462
General Contractor: CGC1517295
Roofing Contractor: CCC1329271
Liability: $2M Insured
Priority In-House Review

Direct Contractor Inquiry

Itemized bids • Engineering review • Zero sales pressure

We respect your privacy. Inquiries are routed directly to John Kraja.