Condo & HOA Services • Field Guide
FL Lic. CGC1517295 • CCC1329271

Do you work with condo associations and HOAs?

John Kraja, Qualifying Contractor
John (Genti Kraja) Master Qualifier • CGC1517295 / CCC1329271
10 Min Read
Updated October 2026

Managing a multi-family condominium community or HOA in South Florida requires navigating complex statutory compliance, board politics, resident coordination, and strict engineering oversight. Following the passage of Florida Senate Bill 4-D (SB 4-D) and Senate Bill 154, condominium associations face mandatory Milestone Structural Inspections and Structural Integrity Reserve Studies (SIRS). Planet Construction partners directly with condo boards, property management companies (CAMs), and consulting engineers to deliver turnkey concrete restoration, balcony rehabilitation, waterproofing, and roofing.

Executive Briefing • Key Takeaways

Florida Code Verified
  • We execute engineer-specified Phase 1 and Phase 2 repair scopes to satisfy mandatory Florida SB 4-D 25-year and 30-year milestone recertification deadlines.
  • Our multi-family capabilities include concrete balcony slab restoration, structural post pocket waterproofing, catwalk repairs, exterior painting, and HVHZ roof replacements.
  • We attend HOA board meetings, provide clear milestone presentations, itemized unit pricing, and execute phased construction schedules that minimize resident disruption.
  • Every project carries $2M+ general liability and statutory workers' compensation coverage, fully compliant with CAM vendor credentialing standards.
In This Guide: Jump to Section

Under Florida Statute ยง 553.899 (established by SB 4-D and updated by SB 154), all residential condominium and cooperative buildings 3 stories or higher must undergo mandatory Milestone Structural Inspections once they reach 30 years of age (or 25 years if located within 3 miles of the coastline), with recurring inspections every 10 years thereafter.

When a licensed structural engineer or architect completes a Phase 1 Visual Inspection or Phase 2 Destructive Testing and identifies structural deterioration (such as rebar spalling, balcony delamination, or roof deck corrosion), the association has a statutory deadline to pull permits and perform structural remediations.

Planet Construction acts as the executing general contractor of record. We review the engineer's exact technical specifications, generate line-item bid packages for board approval, pull the primary building permits, and execute structural repairs under daily threshold inspection protocols.

Key Trades We Execute for Condominiums & HOAs

Balcony & Slab Restoration

Full-depth balcony edge repairs, bottom spall restoration, supplemental rebar welding, and post-tension cable encapsulation adhering to ICRI guidelines.

Waterproofing & Balcony Coatings

Multi-coat elastomeric pedestrian traffic deck coatings that prevent water intrusion into balcony slabs and eliminate corrosive moisture pathways to embedded steel.

High-Rise Roofing & Parapet Walls

Commercial TPO, PVC, and modified bitumen systems engineered for HVHZ wind uplift resistance, complete with crane-assisted material staging and rooftop drainage scuppers.

Railing Post Pocket Waterproofing

Railing post penetrations are the #1 source of balcony spalls. We core-drill, re-grout with non-shrink hydraulic cement, and seal with polyurethane pitch pans.

Board Room Communication & Phased Construction Plans

Working with an HOA or condo board requires transparency and clear communication. Planet Construction provides dedicated account managers who:

  • Attend Board Meetings & Q&A Sessions: John Kraja and our engineering project managers present detailed timelines, explain engineering nuances, and answer resident questions directly.
  • Phased 'Drop-by-Drop' Balcony Scheduling: Rather than closing off an entire building, we mobilize swing stages vertically drop-by-drop, returning balconies to residents as soon as curing and waterproofing are certified.
  • Weekly CAM Progress Reports: We supply property managers with weekly photographic logs and unit-by-unit tracking matrices for clear board recordkeeping.
Direct Qualifier Access • No Middlemen

Have Questions About an Upcoming Project?
Speak Directly With Our Qualifier

Skip the broker runaround and call center gatekeepers. Speak directly with Genti (John) Kraja, qualifying master builder and roofing contractor of record for Planet Construction. We provide engineering feasibility evaluations, code guidance, and itemized bids across South Florida.

No call center. No sales rep. Real answers directly from the license qualifier.

24/7 Roofing & Leak Dispatch Text
954-600-1462
General Contractor: CGC1517295
Roofing Contractor: CCC1329271
Liability: $2M Insured
Priority In-House Review

Direct Contractor Inquiry

Itemized bids • Engineering review • Zero sales pressure

We respect your privacy. Inquiries are routed directly to John Kraja.