40-Year Recertification Repairs in Fort Lauderdale

The 40-year recert process doesn't tolerate shortcuts. We execute the structural and electrical repairs your inspection report requires — and document every step for the county.

SB 4-D / SB 154 Milestone Certified
ICRI 310.1R PROTOCOL 360° Rebar Undercut
100% IN-HOUSE CREWS Zero Subcontracting
Planet Construction supervisor and structural engineering review on active building recertification site
FL STATE LICENSED
CGC1517295 • CCC1329271
>6,500 PSI
Polymer Mortars
3/4" Min
Rebar Clearance
Phase 1 & 2
EOR Remediation
Florida building milestone inspection structural restoration site
100% In-House Crews • Zero Brokers
In-house concrete restoration crew executing structural chipping for building recertification
FIELD EXPERTISE • ICRI STANDARDS

Pass Recert the First Time — With Documentation

40-year building recertification repairs in Fort Lauderdale are a specialized service that Planet Construction FL has delivered for properties across Broward County — helping building owners and managers close out structural inspection findings, satisfy the Broward County Building Department, and receive their recertification certificates. Florida's 40-year recertification requirement exists to ensure that aging buildings meet current structural safety standards, and the repair scope it generates is almost always concrete restoration work — which is exactly what we do. We know what inspectors look for, we know how to execute repairs that satisfy findings, and we know how to keep projects on schedule when deadlines matter.

Phase 2 Defect Remediation

We execute concrete excavations, 360° rebar undercuts, and structural mortar casting mandated by destructive engineering findings.

Certified Hydraulic Shoring

Engineered multi-tier shoring towers support overhead cantilevered slabs before any concrete chipping begins, safeguarding building integrity.

SIRS Reserve Alignment

Itemized unit-by-unit proposals coordinate directly with Structural Integrity Reserve Studies to maximize reserve allocations.

Life Safety • Structural Risk Mitigation

Recert Failures Trigger Real Consequences

The 40-year recertification process exists to catch structural and electrical problems before they become disasters — and the inspectors aren't generous with second chances. Failing recert means re-inspection fees, county notices, special assessments, and a board under pressure from every direction. Generic contractors who don't understand the recert process often do work that the inspector still rejects.

Mandatory Building Department Benchmark • FBC Standards
Engineered Protocol • Quality Assurance

Recert Repairs Done to Inspector Standards

We've executed dozens of recert repair scopes and we know what inspectors look for. We work from your engineer's report, document every repair with photos and material data, and make sure the work meets both code and inspector expectations. The goal is simple: pass the recert the first time, with no re-inspection fees or board headaches.

Fully documented for engineer of record recertification file
RECERTIFICATION SCOPES • PRIMARY DEFICIENCY AREAS

What Is Broward County's 40-Year Recertification Requirement?

Broward County's 40-year building recertification program requires commercial and residential buildings 40 years old to undergo a structural and electrical inspection by a licensed engineer or architect. After the initial recertification, buildings are re-inspected every 10 years. The inspection evaluates the building's structural system — concrete, masonry, steel, and wood framing — for deterioration, damage, and code deficiencies. Electrical systems are similarly reviewed. When deficiencies are identified, the building owner must complete the required repairs and obtain building department approval before the recertification certificate is issued. Buildings that fail to complete recertification face escalating fines and, in cases of serious structural deficiency, may be placed under orders that restrict or prohibit occupancy.

Condominium balcony cantilevered slab spalling and rebar remediation EXTERIOR BALCONIES
SLAB EDGES & UNDERSIDES

Balcony Slab & Edge Spall Repair

Addressing rusted core-drilled aluminum railing posts, spalled drip edges, bottom slab delamination, and top slab surface hollows without destabilizing exterior balustrades.

Schedule Balcony Inspection →
Elevated parking garage concrete deck slab restoration and expansion joints PARKING STRUCTURES
ELEVATED DECKS & RAMPS

Parking Garage Deck & Column Repairs

Full-depth slab excavations, heavy vehicular expansion joint rebuilds, overhead girder spall patching, and multi-tier elastomeric polyurethane traffic deck coating systems.

Schedule Garage Deck Assessment →
Structural load bearing columns and concrete transfer beam shoring LOAD-BEARING FRAMES
COLUMNS, BEAMS & SHEAR WALLS

Columns, Beams & Shear Walls

Engineered temporary shoring, hydraulic jacking where required, vertical bar splice welding, helical tie reinforcement, and high-strength polymer micro-concrete form-and-pour casting.

Request Engineering Consultation →
Post tension tendon cable inspection and GPR radar mapping POST-TENSION SYSTEMS
UNBONDED TENDONS

Post-Tension (PT) Slab Remediation

Ground-penetrating radar tendon scans, moisture grease purging, failed anchorage replacement, calibrated tension retentioning, and pocket epoxy grout sealing.

Inquire About PT Cable Repair →
Condo catwalk exterior corridor structural concrete restoration ACCESS CATWALKS
EXTERIOR CORRIDORS

Catwalk Slabs & Ingress Walkways

High-volume pedestrian walkway repairs, structural spall remediation at expansion joints, non-slip textured waterproofing coats, and emergency egress maintenance during construction.

Inquire Catwalk Restoration →
High pressure polyurethane chemical grout injection for water intrusion MOISTURE REMEDIATION
PRESSURE INJECTION

Polyurethane & Epoxy Injection

High-pressure chemical grout injection to stop active subterranean water leaks in elevator pits, foundation retaining walls, and commercial basement slabs instantly.

Request Leak Diagnostic →
Regulatory Code Standards • FBC & ASTM Compliance

Common Structural Repairs Identified in 40-Year Inspections

Planet Construction FL has executed repair scopes from dozens of 40-year recertification inspection reports across Fort Lauderdale and Broward County. The most frequently identified structural deficiencies follow a consistent pattern: spalling and rebar corrosion on parking garage columns, beams, and ceiling soffits; balcony slab and railing structural deficiencies; catwalk concrete and railing deterioration; expansion joint failure in elevated parking decks and corridor slabs; concrete spalling on building exterior walls and facade elements; foundation waterproofing failures showing as water infiltration into below-grade spaces; and roof parapet deterioration at the building perimeter. Each deficiency requires a specific repair approach, and Planet Construction FL develops a comprehensive repair scope that addresses all findings in a single coordinated project wherever possible — minimizing the disruption and cost of multiple mobilizations.

Licensed CGC1517295 • CCC1329271 Execution
Direct Engineer of Record Special Inspections
Code Assurance Criteria
ENGINEERING PROTOCOL
Sealed PE Affidavits
Signed & sealed engineering inspection reports for city permit closeout.
MATERIAL SPECIFICATION
ASTM C928 Polymer Mortars
High-early strength (>7,500 PSI) with micro-silica and corrosion inhibitor.
LEGAL COMPLIANCE
Florida SB 4-D Milestone
Phase 1 & Phase 2 structural repair scopes fully documented for HOA records.
Request Engineering Scope Review →
THE DUAL-LICENSE DIFFERENCE

Why Hiring a Single-Source General Contractor Saves Projects

Balcony concrete repairs invariably intersect with waterproofing membranes, sliding glass doors, and perimeter stucco. Dividing trades across different vendors creates costly delays and blame games.

THE TRADITIONAL MODEL

Disjointed Subcontracting

Hiring separate concrete repairers, coating painters, and window contractors leads to warranty voids. If a balcony leaks, the waterproofer blames the concrete patch, while the concrete contractor blames the door installer.

Critical Risk: Multi-month finger pointing, uncoordinated site scaffolding, and condo board liability.
MUNICIPAL RAPIDITY

Accelerated Permit Milestones

We pull permits directly from Fort Lauderdale, Pompano Beach, Hollywood, Boca Raton, and Weston building departments. We coordinate engineering special inspections daily to keep projects ahead of statutory SB 4-D deadlines.

Turnkey Efficiency: Faster city sign-offs, reduced resident disruption, and protection against municipal fines.
RIGOROUS 5-PHASE PROTOCOL

Our 40-Year Recertification Repair Process

The process begins with a review of the inspection report — we read every finding, map the locations, and develop a repair scope that directly addresses each deficiency in language that the engineer and building department will recognize as compliant. Permit applications are filed for all structural repair work, and we coordinate with the building department on inspection scheduling to maintain project momentum. Repairs are executed in a logical sequence — typically structural elements first, then waterproofing and surface protection — to avoid redoing work. Throughout the project, our team photographs each repair phase for the documentation package. When structural repairs are complete, we coordinate the engineer of record's site visit and support preparation of the final certification report submitted to the Broward County Building Department for certificate issuance.

01
Initial Assessment

EOR Report Audit

Technicians review engineer Phase 1/Phase 2 findings and conduct sounding hammer surveys to map hollow delaminations hidden beneath paint.

02
Pre-Construction

Shoring & Permitting

Crews erect calibrated hydraulic shoring towers and pull municipal permits, squaring repair edges perpendicularly to eliminate feathered failure zones.

03
Corrosion Control

Rebar Sandblasting

Exposing a full 3/4-inch clearance around rebar, sandblasting steel to bare white metal (SSPC-SP 10), splicing loss over 25%, and coating with cathodic zinc primer.

04
Structural Rebuild

Polymer Mortar Pour

Scrubbing cementitious bonding slurry into SSD substrate, casting high-strength polymer-modified mortar (>6,500 PSI) into formwork, and controlling moisture curing.

05
Envelope Protection

Coating & Sign-Off

Applying multi-layer elastomeric traffic-bearing membrane, conducting water tightness verification, and securing final municipal building department permit sign-off.

Meeting Deadlines — Why Timeline Management Matters
Field Verified • Active Florida Site
Florida Milestone • SB 4-D Engineering Standard
Direct Engineer-of-Record Coordination • Licensed CGC1517295 Execution
Commercial Asset Managers • HOA Boards

Meeting Deadlines — Why Timeline Management Matters

Broward County's 40-year recertification timeline is not flexible. Buildings that receive orders for non-compliance face accumulating daily fines and, in cases of serious structural concern, may face occupancy restrictions that displace residents and tenants. Planet Construction FL understands that recertification repair projects have real regulatory deadlines — not just target dates — and we manage our projects with that urgency. We maintain the resources to mobilize quickly on recertification projects, we coordinate permit applications efficiently, and we communicate proactively with property managers and HOA boards on project status so that scheduling surprises don't create compliance gaps. Our track record on recertification projects is built on getting buildings to their certificates on time.

Multi-Unit Program Support

Phased construction logistics, resident notices, reserve study alignment, and direct engineer of record milestone recertification sign-offs.

HOA Board Presentation Packages & Milestone Recertification Decks
Multi-Year Capital Expenditure Phasing to Mitigate Special Assessments
Request Program Proposal Direct Qualifier CGC1517295 • No Obligation Board Review
FIELD CRAFT • REAL SOUTH FLORIDA SITES

Verified Project Spotlight • South Florida Concrete Restorations

Documented case studies showcasing engineered structural repairs across Broward and Palm Beach County properties.

Weston Condominium Balcony Spall Repair & Structural Recertification
DIV 03 • STRUCTURAL Weston, FL • 2024
WESTON • CONDOS

Condo Balcony Structural Restoration

Executed full-depth balcony spall repairs, railing post pocket coring, and applied multi-layer pedestrian traffic coatings for 48 residential units under strict HOA rules.

Permit Approved • City of Weston
Coastal High-Rise Shear Wall & Parapet Restoration in Broward County
DIV 03 • COASTAL Pompano Beach, FL
POMPANO BEACH • COASTAL TOWER

Shear Wall & Parapet Restoration

Extensive rebar replacement and form-and-pour micro-concrete jackets for exposed coastal parapet walls and parking garage support columns suffering marine corrosion.

SB 4-D Milestone Compliant • Broward County
In-house concrete restoration crew pouring polymer structural mortar
DIV 03 • PARKING DECK Fort Lauderdale, FL
FORT LAUDERDALE • COMMERCIAL

Commercial Garage Deck Resurfacing

Hydro-demolition of 6,500 sq ft delaminated garage deck concrete, installation of heavy-duty expansion joints, and vehicular polyurethane traffic membrane.

Zero Downtime Phasing • City of Fort Lauderdale

Offering Entire Superior Services Solutions

Single-source general contracting, coastal roofing, and structural restoration engineered for South Florida.

Genti Kraja (John) - Planet Construction Qualifying Contractor
COMMON QUESTIONS • STRAIGHT ANSWERS

Frequently Asked Questions

Clear answers regarding engineering specifications, municipal code compliance, and structural concrete restoration standards.

How long do 40-year recertification repairs typically take?

Timeline depends entirely on the extent of deficiencies identified in the inspection report. A building with minor spall repairs and a few joint issues can complete recertification repairs in 3–6 weeks. A building with widespread parking garage deterioration, multiple balcony deficiencies, and façade spalling may take 3–6 months. After reviewing your inspection report, Planet Construction FL provides a project timeline estimate before committing to a contract — so you know what to plan for.

Can we use Planet Construction FL if we already have a structural engineer engaged?

Yes — and this is the typical arrangement. The structural engineer produces the inspection report and serves as the engineer of record for the repair phase. Planet Construction FL serves as the general contractor executing the repairs to the engineer's specifications. We work with the engineer your association has already engaged and have established working relationships with many of the structural engineering firms active in Broward County's recertification market.

What happens if new structural issues are discovered during repair work?

It happens — particularly on concrete demolition that reveals more extensive rebar corrosion than was visible during the initial inspection. Planet Construction FL documents all additional findings immediately, communicates them to the engineer of record, and presents a scope and cost adjustment for the additional work. We never proceed with additional scope beyond the original contract without explicit approval. Our documentation of additional findings is prepared in a format that the building department recognizes for permit amendment and engineer approval.

Do 40-year recertification repairs cover electrical work?

Planet Construction FL specializes in structural concrete restoration — we do not perform electrical work. Where a recertification inspection identifies electrical deficiencies alongside structural findings, we coordinate with licensed electrical contractors as subcontractors or refer property owners to qualified electricians to address those findings concurrently with our structural repair scope, so the building achieves full recertification in the most efficient timeframe.

FAST WRITTEN ESTIMATES • DIRECT ACCOUNTABILITY

Get Your Recertification Repair Assessment

Schedule a free recert repair consultation. We'll review your inspection report and propose a repair plan built to pass the first time.

Facing a municipal milestone deadline?

Speak directly with John, Qualifying Contractor (CGC1517295 & CCC1329271). We respond within 15 minutes during business hours.

(754) 301-6747
  • Florida Certified General Contractor • Lic #CGC1517295
  • Florida Certified Roofing Contractor • Lic #CCC1329271
  • $2,000,000 General Liability + Complete Workers' Comp

Zero obligation. Engineering documents held under strict commercial confidentiality.