STRUCTURAL CONCRETE • DIV 03 FL CGC1517295 • CCC1329271

Epoxy Injection Crack Repair in Fort Lauderdale, FL

Structural cracks need more than caulk — they need pressure-injected epoxy that bonds concrete back together. We restore load capacity, not just appearance.

ICRI 310.1R Protocol 360° Rebar Undercut
Hydraulic Shoring Certified Axial Transfer
100% In-House Crews Zero Subcontracting
High-Pressure Structural Epoxy Injection for Concrete Slabs
FL STATE LICENSED
CGC1517295 • CCC1329271
>6,500 PSI
Polymer Mortar
3/4" Min
Rebar Clearance
100%
Monolithic Bond
High-Pressure Structural Epoxy Injection for Concrete Slabs on active South Florida job site
100% In-House Crews • Zero Brokers
Dedicated Planet Construction crews executing Structural Concrete Restoration Division
FIELD EXPERTISE • ICRI STANDARDS

Structural Crack Repair That Restores Load Capacity

Epoxy injection crack repair in Fort Lauderdale is the precision solution for restoring structural integrity to cracked concrete beams, slabs, walls, and columns — without extensive demolition or disruption. When concrete cracks, the two faces of the crack can still be monolithically bonded through the epoxy injection process, restoring the member to its original load-carrying capacity. At Planet Construction FL, our technicians use low-pressure epoxy injection systems that fill cracks completely — from the surface to the deepest point of penetration — producing a bond stronger than the original concrete.

ICRI 310.1R Protocol

Full 360° rebar undercut, mechanical rust descaling to bare metal, and cathodic zinc primer application.

Certified Hydraulic Shoring

Engineered multi-tier shoring towers safely support live and dead superstructure loads prior to chipping.

EOR Permitting & Sign-Off

Turnkey threshold special inspections, concrete cylinder break tests, and final municipal certificate of completion.

Life Safety • Structural Risk Mitigation

Structural Cracks Won't Heal Themselves

Structural cracks aren't surface flaws — they're load-path failures. A crack that goes through a beam, slab, or wall has reduced that element's capacity, and surface caulk does nothing to restore it. Worse, open cracks let water and chlorides reach the rebar, accelerating corrosion and widening the crack with every wet season. The longer it stays open, the more expensive the real fix becomes.

Mandatory Building Department Benchmark • FBC Standards
Engineered Protocol • Quality Assurance

Pressure-Injected Repairs That Restore the Load Path

We map every crack, install injection ports along its length, and pressure-inject structural epoxy that penetrates the full depth of the crack. As the epoxy cures, it bonds the concrete back together at near-original strength and seals the crack against future water intrusion. We document the repair with photos and product data so you have proof of method and material.

Fully documented for engineer of record recertification file
CORE STRUCTURAL DEFICIENCIES • DIVISION SCOPES

What Is Epoxy Injection and How It Works

Epoxy injection is a structural repair technique that bonds cracked concrete by filling the crack void with a two-component epoxy resin system. Entry ports are drilled along the crack at calculated intervals — typically one crack-width apart — and low-pressure injection ports are installed. The two epoxy components are combined and injected under controlled pressure, starting from the lowest port and progressing upward as each port accepts material and fills the crack to the next port above. The fully cured epoxy bond achieves tensile strength exceeding the concrete itself, restoring the cracked section to structural continuity. The process is minimally invasive and leaves no visible profile change on the concrete surface.

High-Pressure Structural Epoxy Injection for Concrete Slabs division scope 1 SPECIALIZED DIVISION
ENGINEERED RESTORATION

High-Pressure Structural Epoxy Injection for Concrete Slabs Core Remediation

Comprehensive repair protocols meeting Florida Building Code and structural engineering specifications.

Request Detailed Quote →
Building envelope moisture protection SURFACE PROTECTION
MOISTURE & TRAFFIC COATINGS

Waterproof Membrane Integration

Seamless elastomeric barriers protecting underlying assemblies from South Florida salt-air and rain penetration.

View Waterproofing Options →
Structural frame and load bearing support STRUCTURAL FRAMES
LOAD-BEARING ELEMENTS

Structural Reinforcement & Shoring

Engineered hydraulic load transfer towers, steel splice welds, and polymer micro-concrete jacketing.

Inquire About Shoring →
Specialized engineering inspection and quality control QUALITY CONTROL
MUNICIPAL COMPLIANCE

Threshold Inspections & Testing

On-site special inspector reviews, cylinder breaks, pull-off adhesion testing, and certificate of completion.

Request Engineering Audit →
Commercial building facade and exterior refresh EXTERIOR ENVELOPE
EXTERIOR RESTORATION

Facade & Perimeter Protection

Stucco crack isolation, urethane expansion joint renewal, and coastal salt corrosion shielding systems.

Explore Facade Services →
High-pressure chemical grout injection and emergency response SUBTERRANEAN DEFENSE
ACTIVE LEAK DEFENSE

Pressure Chemical Grout Injection

Hydrophobic polyurethane and epoxy injection stopping subterranean water intrusion in elevator pits and foundations.

Request Leak Diagnostic →
Regulatory Code Standards • FBC & ASTM Compliance

When Epoxy Injection Is the Right Solution

Epoxy injection is appropriate for structural concrete cracks where the two crack faces are stable — not actively growing or moving. Ideal applications include cracks in load-bearing beams and slabs where structural continuity has been lost, cracks in foundation walls with no active hydrostatic pressure, and diagonal cracks in columns resulting from past overload or seismic events. It is not appropriate for actively growing cracks caused by ongoing settlement or loading changes, or for cracks with live water flowing through them — polyurethane injection is the solution for wet, active cracks. Our assessment determines which injection system is right for each crack type before any work begins.

Licensed CGC1517295 • CCC1329271 Execution
Direct Engineer of Record Special Inspections
Code Assurance Criteria
ENGINEERING PROTOCOL
Sealed PE Affidavits
Signed & sealed engineering inspection reports for city permit closeout.
MATERIAL SPECIFICATION
ASTM C928 Polymer Mortars
High-early strength (>7,500 PSI) with micro-silica and corrosion inhibitor.
LEGAL COMPLIANCE
Florida SB 4-D Milestone
Phase 1 & Phase 2 structural repair scopes fully documented for HOA records.
Request Engineering Scope Review →
THE DUAL-LICENSE DIFFERENCE

Why Hiring a Single-Source General Contractor Saves Projects

Concrete structural restorations intersect with waterproofing membranes, expansion joints, and municipal milestone permits. Dividing trades creates delays, finger-pointing, and voided warranties.

THE TRADITIONAL MODEL

Disjointed Subcontracting

Separate concrete patchers, painters, and coating contractors frequently void each other's warranties. If water intrusion recurs, the waterproofer blames the concrete mortar while the mason blames the sealant.

Critical Risk: Multi-vendor disputes, finger-pointing over leaks or failures, and voided manufacturer warranties.
MUNICIPAL RAPIDITY

Accelerated Permit Milestones

We pull permits directly across Fort Lauderdale, Pompano Beach, Hollywood, Boca Raton, and Weston building departments. We coordinate engineering special inspections daily to prevent costly stop-work delays.

Turnkey Efficiency: Faster city sign-offs, reduced disruption, and full Florida Building Code certification.
RIGOROUS 5-PHASE PROTOCOL

Epoxy vs. Polyurethane Injection — Choosing the Right System

Epoxy injection bonds crack faces rigidly — the cured material is hard, strong, and non-flexible. This makes it the right choice for structural cracks in stable concrete where restoring load transfer is the objective. Polyurethane injection foams and expands on contact with moisture, making it ideal for wet cracks, active water leaks through concrete, and situations where some flexibility in the repaired zone is acceptable. Using the wrong material for a given crack type wastes money and fails to solve the problem. Planet Construction FL accurately diagnoses each crack's characteristics — width, depth, activity, moisture condition — and specifies the correct injection system for each situation.

01
Initial Assessment

EOR Audit & Delamination Sounding

Technicians review engineer reports and conduct acoustical hammer sounding surveys to map hidden subsurface delaminations.

02
Pre-Construction

Certified Shoring & Permitting

Erecting calibrated multi-tier hydraulic shoring towers and pulling municipal building department permits across South Florida.

03
Site Preparation

ICRI 360° Rebar Demolition

Chipping concrete to 3/4-inch clearance around oxidized steel, sandblasting to bare metal (SSPC-SP 10), and applying cathodic zinc primer.

04
Precision Execution

Polymer Mortar Cast & Curing

Scrubbing cementitious bonding slurry into SSD substrate, casting high-strength micro-concrete (>6,500 PSI), and controlling wet curing.

05
Quality & Sign-Off

Protective Membrane & Sign-Off

Applying elastomeric waterproofing barrier coats, performing flood testing, and securing final municipal building department permit sign-off.

Structural vs. Non-Structural Cracks — A Critical Distinction
Field Verified • Active Florida Site
Florida Milestone • SB 4-D Engineering Standard
Direct Engineer-of-Record Coordination • Licensed CGC1517295 Execution
Commercial Asset Managers • HOA Boards

Structural vs. Non-Structural Cracks — A Critical Distinction

Not every crack in concrete is a structural concern, but every crack is a potential water infiltration pathway in South Florida's environment. Hairline surface cracks (under 0.010 inches wide) in concrete slabs are often the result of normal shrinkage during curing and may not require structural repair, though they benefit from sealing. Cracks wider than 0.010 inches in structural members — beams, slabs, load-bearing walls — should be evaluated by a professional to determine whether structural repair is required. Diagonal cracks at 45-degree angles in beams or columns, through-cracks in walls, and cracks accompanied by deflection or movement are all indications that structural epoxy injection and engineering review are needed immediately.

Multi-Unit Program Support

Phased construction logistics, resident notices, reserve study alignment, and direct engineer of record milestone recertification sign-offs.

HOA Board Presentation Packages & Milestone Recertification Decks
Multi-Year Capital Expenditure Phasing to Mitigate Special Assessments
Request Program Proposal Direct Qualifier CGC1517295 • No Obligation Board Review
Field Engineering Specifications • Structural Adequacy

Our Epoxy Injection Process

Our process starts with crack mapping — documenting width, length, depth, and orientation of all cracks in the repair scope. The crack surface is cleaned of debris, dust, and contamination that would prevent proper epoxy adhesion. Entry ports are drilled at calculated intervals along the crack. Ports are epoxy-bonded to the concrete surface and allowed to cure. The crack face between ports is surface-sealed with epoxy paste to contain the injection material. Epoxy is mixed, loaded into the injection equipment, and injected under low controlled pressure, progressing sequentially up the crack. After full cure, ports are removed, flush-filled, and the surface is finished. A load test or pull-off test may be performed on representative samples to verify bond strength where engineering documentation is required.

ACI 318 • ICRI 310.1R Field Adherence
Zero Subcontractor Handoffs
Request Scope Consultation
FIELD CRAFT • REAL SOUTH FLORIDA SITES

Verified Project Spotlight • South Florida Concrete Restorations

Documented case studies showcasing engineered structural repairs across Broward and Palm Beach County properties.

Condo Balcony Structural Restoration
DIV 03 • STRUCTURAL Weston, FL
WESTON • CONDOS

Condo Balcony Structural Restoration

Full-depth cantilevered balcony spall excavations, railing pocket re-anchoring, and multi-layer pedestrian traffic coatings for 48 units.

Permit Approved • City of Weston
Shear Wall & Parapet Restoration
DIV 07 • ENVELOPE Pompano Beach, FL
POMPANO BEACH • COASTAL TOWER

Shear Wall & Parapet Restoration

Extensive rebar replacement, micro-concrete form-and-pour jackets, and salt corrosion shielding for coastal high-rise assemblies.

SB 4-D Milestone Compliant • Broward County
Commercial Garage Deck Resurfacing
DIV 08 • COMMERCIAL Fort Lauderdale, FL
FORT LAUDERDALE • COMMERCIAL

Commercial Garage Deck Resurfacing

Hydro-demolition of 6,500 sq ft delaminated deck concrete, heavy vehicular expansion joints, and polyurethane traffic membranes.

Zero Downtime Phasing • City of Fort Lauderdale

Offering Entire Superior Services Solutions

Single-source general contracting, coastal roofing, and structural restoration engineered for South Florida.

Genti Kraja (John) - Planet Construction Qualifying Contractor
COMMON QUESTIONS • STRAIGHT ANSWERS

Frequently Asked Questions

Clear answers regarding engineering specifications, municipal code compliance, and structural concrete restoration standards.

Is epoxy injection as strong as the original concrete?

Yes — and in most cases stronger. Properly injected and cured structural epoxy achieves tensile strength of 4,000 to 6,000 psi, which typically exceeds the tensile capacity of the concrete surrounding the crack. The bond is monolithic — the crack effectively disappears as a structural discontinuity once epoxy has fully cured.

How long does epoxy injection take?

Port installation and injection for a typical crack — 3 to 10 linear feet — takes 1–3 hours of active work time. Epoxy cure time is typically 24–48 hours before the repaired member can return to service load. Larger projects with multiple cracks are staged over multiple days as needed.

Can epoxy injection stop water leaks?

For dry or dormant cracks, yes — epoxy injection creates a watertight bond. For cracks with active water flow, polyurethane injection is more appropriate because it foams and expands in the presence of moisture, effectively plugging the water pathway. We specify the correct system based on each crack's moisture condition.

Do cracks come back after epoxy injection?

If the underlying cause of the crack has been resolved — overloading addressed, settlement stabilized, rebar corrosion treated — epoxy injection provides a permanent repair. If the cause is ongoing (active settlement, live overload, growing corrosion), new cracks will eventually form. Our assessment always includes investigation of crack causes, not just the cracks themselves.

FAST WRITTEN ESTIMATES • DIRECT ACCOUNTABILITY

Get a Crack Assessment — Free Inspection

Send us photos or schedule an on-site visit. We'll evaluate the cracks and recommend the right repair method — no obligation.

Need immediate contractor answers?

Speak directly with John Kraja, Qualifying Contractor (CGC1517295 & CCC1329271). No salesmen, no middleman brokers. We respond within 15 minutes during business hours.

(754) 301-6747
  • Florida Certified General Contractor • Lic #CGC1517295
  • Florida Certified Roofing Contractor • Lic #CCC1329271
  • $2,000,000 General Liability + Complete Workers' Comp

Zero obligation. Engineering and site plans held under strict commercial confidentiality.