STRUCTURAL CONCRETE • DIV 03 FL CGC1517295 • CCC1329271

Structural Engineering Report Support in Fort Lauderdale

When your engineer's report lands, you need a contractor who can read it and act on it. We turn structural recommendations into completed, documented repairs.

ICRI 310.1R Protocol 360° Rebar Undercut
Hydraulic Shoring Certified Axial Transfer
100% In-House Crews Zero Subcontracting
Structural Concrete Inspection & Engineering Milestone Reports
FL STATE LICENSED
CGC1517295 • CCC1329271
>6,500 PSI
Polymer Mortar
3/4" Min
Rebar Clearance
100%
Monolithic Bond
Structural Concrete Inspection & Engineering Milestone Reports on active South Florida job site
100% In-House Crews • Zero Brokers
Dedicated Planet Construction crews executing Structural Concrete Restoration Division
FIELD EXPERTISE • ICRI STANDARDS

Turn Engineering Reports Into Completed Repairs

Structural engineering report support in Fort Lauderdale bridges the gap between what the engineer documents and what actually gets fixed. Structural inspection reports — whether produced for 40-year recertification, SB 4-D milestone compliance, insurance assessments, or property transactions — identify what is wrong but do not fix it. Translating a report's findings into a quality repair scope requires a contractor who reads engineering reports fluently, understands what each finding demands, and has the technical capability to execute repairs that satisfy the engineer of record. That is exactly what Planet Construction FL does.

ICRI 310.1R Protocol

Full 360° rebar undercut, mechanical rust descaling to bare metal, and cathodic zinc primer application.

Certified Hydraulic Shoring

Engineered multi-tier shoring towers safely support live and dead superstructure loads prior to chipping.

EOR Permitting & Sign-Off

Turnkey threshold special inspections, concrete cylinder break tests, and final municipal certificate of completion.

Life Safety • Structural Risk Mitigation

Reports Don't Fix Themselves

An engineering report tells you what's wrong — but it doesn't tell you who can actually execute the repairs. Many property owners get a detailed report and then spend weeks chasing contractors who don't understand structural specifications, can't read load diagrams, or change scope on the fly. The result is delays, mismatched work, and a final result the engineer won't sign off on.

Mandatory Building Department Benchmark • FBC Standards
Engineered Protocol • Quality Assurance

We Read the Report and Build the Fix

We read the engineering report, ask the right questions, and translate it into a clear repair scope you can approve. Then we execute the work to specification, document every step with photos and material records, and provide a closeout package the engineer can sign off on. One contractor, one process, one set of records.

Fully documented for engineer of record recertification file
CORE STRUCTURAL DEFICIENCIES • DIVISION SCOPES

When You Need Structural Engineering Report Support

Property owners and managers in Fort Lauderdale encounter structural engineering reports in a variety of situations. The 40-year recertification process generates a formal inspection report with specific deficiency findings that must be repaired and signed off. SB 4-D milestone inspections produce Phase 1 and Phase 2 reports with similarly binding repair requirements. Commercial property transactions often involve structural due diligence reports that identify deferred maintenance and structural deficiencies as part of the buyer's assessment. Insurance claims after hurricane or water damage events may involve engineering assessments that document structural damage for coverage purposes. In each case, the report is the beginning of the repair process — and Planet Construction FL provides the expertise to execute what the report requires.

Structural Concrete Inspection & Engineering Milestone Reports division scope 1 SPECIALIZED DIVISION
ENGINEERED RESTORATION

Structural Concrete Inspection & Engineering Milestone Reports Core Remediation

Comprehensive repair protocols meeting Florida Building Code and structural engineering specifications.

Request Detailed Quote →
Building envelope moisture protection SURFACE PROTECTION
MOISTURE & TRAFFIC COATINGS

Waterproof Membrane Integration

Seamless elastomeric barriers protecting underlying assemblies from South Florida salt-air and rain penetration.

View Waterproofing Options →
Structural frame and load bearing support STRUCTURAL FRAMES
LOAD-BEARING ELEMENTS

Structural Reinforcement & Shoring

Engineered hydraulic load transfer towers, steel splice welds, and polymer micro-concrete jacketing.

Inquire About Shoring →
Specialized engineering inspection and quality control QUALITY CONTROL
MUNICIPAL COMPLIANCE

Threshold Inspections & Testing

On-site special inspector reviews, cylinder breaks, pull-off adhesion testing, and certificate of completion.

Request Engineering Audit →
Commercial building facade and exterior refresh EXTERIOR ENVELOPE
EXTERIOR RESTORATION

Facade & Perimeter Protection

Stucco crack isolation, urethane expansion joint renewal, and coastal salt corrosion shielding systems.

Explore Facade Services →
High-pressure chemical grout injection and emergency response SUBTERRANEAN DEFENSE
ACTIVE LEAK DEFENSE

Pressure Chemical Grout Injection

Hydrophobic polyurethane and epoxy injection stopping subterranean water intrusion in elevator pits and foundations.

Request Leak Diagnostic →
Regulatory Code Standards • FBC & ASTM Compliance

What Engineering Reports Look For in Fort Lauderdale Buildings

South Florida's structural engineering inspection reports for concrete buildings consistently address a predictable set of concerns. Concrete cover condition — particularly the degree of spalling and rebar corrosion exposure — is the primary focus in the coastal environment. Post-tensioned slab conditions, including tendon corrosion indicators and slab crack patterns, are noted in buildings with PT construction. Balcony and catwalk structural and life safety conditions are evaluated, including both concrete condition and railing code compliance. Waterproofing conditions at decks, roofs, and below-grade areas are assessed for their contribution to moisture-driven deterioration. Foundation condition and drainage adequacy are reviewed. Understanding what engineers are looking for — and how their findings map to repair scope — is core to Planet Construction FL's value in the post-inspection repair process.

Licensed CGC1517295 • CCC1329271 Execution
Direct Engineer of Record Special Inspections
Code Assurance Criteria
ENGINEERING PROTOCOL
Sealed PE Affidavits
Signed & sealed engineering inspection reports for city permit closeout.
MATERIAL SPECIFICATION
ASTM C928 Polymer Mortars
High-early strength (>7,500 PSI) with micro-silica and corrosion inhibitor.
LEGAL COMPLIANCE
Florida SB 4-D Milestone
Phase 1 & Phase 2 structural repair scopes fully documented for HOA records.
Request Engineering Scope Review →
THE DUAL-LICENSE DIFFERENCE

Why Hiring a Single-Source General Contractor Saves Projects

Concrete structural restorations intersect with waterproofing membranes, expansion joints, and municipal milestone permits. Dividing trades creates delays, finger-pointing, and voided warranties.

THE TRADITIONAL MODEL

Disjointed Subcontracting

Separate concrete patchers, painters, and coating contractors frequently void each other's warranties. If water intrusion recurs, the waterproofer blames the concrete mortar while the mason blames the sealant.

Critical Risk: Multi-vendor disputes, finger-pointing over leaks or failures, and voided manufacturer warranties.
MUNICIPAL RAPIDITY

Accelerated Permit Milestones

We pull permits directly across Fort Lauderdale, Pompano Beach, Hollywood, Boca Raton, and Weston building departments. We coordinate engineering special inspections daily to prevent costly stop-work delays.

Turnkey Efficiency: Faster city sign-offs, reduced disruption, and full Florida Building Code certification.
RIGOROUS 5-PHASE PROTOCOL

Repair After the Report — Our Role

Planet Construction FL's role in structural engineering report support is the repair execution. We review the report, identify every structural finding, and develop a detailed repair scope in direct response to the engineer's documentation. Our scope proposal maps each finding in the report to a specific repair action, material specification, and cost — so property owners understand exactly what is being addressed and why. We submit permit applications for all structural repair work, coordinate with the engineer of record on repair design approval, and execute repairs to the specifications the engineer requires. Photographs and material documentation are maintained throughout the project for the engineer's final review. When repairs are complete, we support the engineer's return inspection and report closeout — the final step that converts a deficiency finding into a closed item.

01
Initial Assessment

EOR Audit & Delamination Sounding

Technicians review engineer reports and conduct acoustical hammer sounding surveys to map hidden subsurface delaminations.

02
Pre-Construction

Certified Shoring & Permitting

Erecting calibrated multi-tier hydraulic shoring towers and pulling municipal building department permits across South Florida.

03
Site Preparation

ICRI 360° Rebar Demolition

Chipping concrete to 3/4-inch clearance around oxidized steel, sandblasting to bare metal (SSPC-SP 10), and applying cathodic zinc primer.

04
Precision Execution

Polymer Mortar Cast & Curing

Scrubbing cementitious bonding slurry into SSD substrate, casting high-strength micro-concrete (>6,500 PSI), and controlling wet curing.

05
Quality & Sign-Off

Protective Membrane & Sign-Off

Applying elastomeric waterproofing barrier coats, performing flood testing, and securing final municipal building department permit sign-off.

Structural Reports for Insurance & Commercial Transactions
Field Verified • Active Florida Site
Florida Milestone • SB 4-D Engineering Standard
Direct Engineer-of-Record Coordination • Licensed CGC1517295 Execution
Commercial Asset Managers • HOA Boards

Structural Reports for Insurance & Commercial Transactions

Structural engineering reports generated for insurance purposes or commercial property transactions require the same quality of repair execution as regulatory compliance reports — but with an added emphasis on documentation. Insurance repairs must be documented in a format that supports claim settlement and demonstrates that the damaged conditions were fully addressed. Pre-transaction repair work must demonstrate to the buyer's engineer that the deficiencies identified in the due diligence report have been properly remediated. Planet Construction FL provides the written documentation, photographic records, and material certifications needed to support both insurance claim closure and buyer engineer review, giving property owners and brokers the paper trail that complex transactions and claims require.

Multi-Unit Program Support

Phased construction logistics, resident notices, reserve study alignment, and direct engineer of record milestone recertification sign-offs.

HOA Board Presentation Packages & Milestone Recertification Decks
Multi-Year Capital Expenditure Phasing to Mitigate Special Assessments
Request Program Proposal Direct Qualifier CGC1517295 • No Obligation Board Review
FIELD CRAFT • REAL SOUTH FLORIDA SITES

Verified Project Spotlight • South Florida Concrete Restorations

Documented case studies showcasing engineered structural repairs across Broward and Palm Beach County properties.

Condo Balcony Structural Restoration
DIV 03 • STRUCTURAL Weston, FL
WESTON • CONDOS

Condo Balcony Structural Restoration

Full-depth cantilevered balcony spall excavations, railing pocket re-anchoring, and multi-layer pedestrian traffic coatings for 48 units.

Permit Approved • City of Weston
Shear Wall & Parapet Restoration
DIV 07 • ENVELOPE Pompano Beach, FL
POMPANO BEACH • COASTAL TOWER

Shear Wall & Parapet Restoration

Extensive rebar replacement, micro-concrete form-and-pour jackets, and salt corrosion shielding for coastal high-rise assemblies.

SB 4-D Milestone Compliant • Broward County
Commercial Garage Deck Resurfacing
DIV 08 • COMMERCIAL Fort Lauderdale, FL
FORT LAUDERDALE • COMMERCIAL

Commercial Garage Deck Resurfacing

Hydro-demolition of 6,500 sq ft delaminated deck concrete, heavy vehicular expansion joints, and polyurethane traffic membranes.

Zero Downtime Phasing • City of Fort Lauderdale

Offering Entire Superior Services Solutions

Single-source general contracting, coastal roofing, and structural restoration engineered for South Florida.

Genti Kraja (John) - Planet Construction Qualifying Contractor
COMMON QUESTIONS • STRAIGHT ANSWERS

Frequently Asked Questions

Clear answers regarding engineering specifications, municipal code compliance, and structural concrete restoration standards.

Do we need to use the same contractor the engineer recommends?

No — engineers are ethically required to recommend contractors based on qualifications, not business relationships. You are free to select any licensed general contractor to execute the repairs identified in a structural report. Planet Construction FL is an experienced, licensed general contractor with a proven track record on structural report repair scopes in Fort Lauderdale and Broward County. We welcome the opportunity to review your report and provide a competitive proposal.

What if the repair scope in the report is unclear?

Structural reports vary in their level of repair specification detail — some provide precise repair methods, others identify the problem and leave repair methodology to the contractor and engineer to agree on. Planet Construction FL reads ambiguous findings carefully, consults with the engineer of record where the repair approach is not clear, and does not proceed with work that hasn't been agreed to be the appropriate solution. We never assume what an engineering finding requires — we verify with the engineer before mobilizing.

How do we get our engineer to close out the repair findings?

The engineer of record closes out repair findings by reviewing Planet Construction FL's documentation — photographs, material submittals, test reports where applicable — and conducting a site inspection of the completed repairs. We support this process by maintaining organized documentation throughout the project and coordinating the engineer's site visit at project completion. The engineer then issues an updated report or letter confirming that the findings have been addressed, which is submitted to the building department for permit closeout and certificate issuance.

Can Planet Construction FL help us find a structural engineer if we don't have one?

Yes — we can provide referrals to licensed structural engineering firms with extensive experience in South Florida's 40-year recertification, SB 4-D milestone inspection, and general structural assessment work. We work with multiple engineering firms throughout Broward County and can match your project type and timeline with appropriate engineering resources. The engineering engagement is separate from our construction contract — we act as the contractor, not the engineer's agent.

FAST WRITTEN ESTIMATES • DIRECT ACCOUNTABILITY

Bring Your Engineering Report — We'll Build the Fix

Send us your engineering report. We'll review it, scope the repairs, and give you a transparent, code-compliant quote — at no cost.

Need immediate contractor answers?

Speak directly with John Kraja, Qualifying Contractor (CGC1517295 & CCC1329271). No salesmen, no middleman brokers. We respond within 15 minutes during business hours.

(754) 301-6747
  • Florida Certified General Contractor • Lic #CGC1517295
  • Florida Certified Roofing Contractor • Lic #CCC1329271
  • $2,000,000 General Liability + Complete Workers' Comp

Zero obligation. Engineering and site plans held under strict commercial confidentiality.