CASE STUDY #07 • STRUCTURAL CONCRETE RESTORATION Delray Beach, FL

Delray Beach Commercial Parking Deck Concrete Restoration

Comprehensive structural concrete rehabilitation and post-tension tendon repair across a 42,000 sq ft multi-level commercial parking structure in downtown Delray Beach, restoring structural integrity while keeping retail parking operations 100% active.

Request Similar Scope Estimate Speak with John: (754) 301-6747
Project Telemetry Data VERIFIED COMPLIANCE
Client Entity Atlantic Horizon Commercial Garage & Retail
Municipal Authority City of Delray Beach Building Department
Permit Reference Permit #STR-2024-02941
Mandate Standard Commercial Structural Recertification • PTI DC80.3
Scope Scale 42,000 SQ FT Parking Deck Structure
Contract Value – Structural Contract
Supervising Qualifier: John Kraja • CGC1517295 • CCC1329271

The Structural Challenge: Severed Tendons & Overhead Spalling Hazards

Serving busy Atlantic Avenue retail and dining destinations, the 2-level commercial parking structure faced severe concrete degradation.

Years of vehicle traffic, standing rainwater, and exhaust carbonation had penetrated unsealed contraction joints. Overhead concrete delaminations on the underside of elevated drive aisles posed an urgent safety hazard to vehicles and pedestrians below.

Most critically, ultrasonic testing revealed 18 compromised unbonded post-tension tendons whose protective plastic sheathing had cracked, allowing water to oxidize internal high-tensile steel cables. Closing the garage would cause catastrophic revenue loss for downtown merchants.

42,000
Square Feet Restored
18
PT Tendons Restressed
33,000
LBS Hydraulic Jack Tension
100%
Garage Kept Operational
Commercial parking deck concrete restoration and post-tension cable repair in Delray Beach
Verified On-Site Construction • Delray Beach, FL

The Engineering Execution: Phased Post-Tension & Jacketing Protocol

Planet Construction implemented a 4-phase traffic diversion plan that maintained 75% parking capacity while heavy structural shoring and stressing occurred.

01

High-Frequency 2.6 GHz GPR Radar Scanning

Ground penetrating radar scanned slab interiors to pinpoint exact cable depths and conduit trajectories, eliminating the risk of cutting live neighboring cables.

GSSI 2.6 GHz High-Frequency GPR Survey
02

Overhead Concrete Hydro-Demolition & Shoring

Hydraulic shoring towers supported elevated slabs while hydro-demolition chipped away delaminated overhead beam sections back to sound parent concrete.

ICRI Guideline 310.1R Overhead Preparation
03

Dogbone Coupler Splicing & Hydraulic Tensioning

Corroded tendon segments were cut out cleanly, spliced with PTI-approved dogbone couplers, and re-stressed to 33,000 lbs force using calibrated hydraulic stressing jacks.

PTI DC80.3 Post-Tension Field Standard
04

Micro-Concrete Jacketing & Zinc Priming

Treated rebar was encapsulated with sacrificial anodes and pumped with self-consolidating, high-early-strength micro-concrete (5,000+ PSI).

ASTM C928 Polymer Mortar • NACE Cathodic
05

Heavy Vehicular Polyurethane Deck Waterproofing

Application of multi-layer elastomeric vehicular traffic deck membrane with aluminum oxide aggregate to withstand tire shear and resist petroleum fluids.

ASTM C957 Vehicular Heavy-Traffic System

Technical Specifications & Municipal Verification Log

Every material and method deployed adhered strictly to Florida Building Code, manufacturer warranties, and signed engineering calculations.

Scope Parameter Engineered Specification Governing Standard Verification Method
Non-Destructive Testing 2.6 GHz high-frequency GPR concrete scanning and ultrasonic flaw detection ASTM D4748 Radar Standard Engineer-of-Record Radar Map Sign-Off
Post-Tension Tendon Strand 0.5-inch 270k low-relaxation 7-wire steel prestressing strands ASTM A416 Prestressing Strand Mill Test Reports & PTI Certifications
Hydraulic Stressing Force Calibrated single-strand hydraulic jack pulling to 33,000 lbs (80% MUTS) PTI Field Repair Manual Calibrated Gauge Elongation Log
Overhead Repair Material SikaGrout 212 / MasterEmaco S 440 high-early-strength structural micro-concrete ASTM C1107 Non-Shrink Standard Third-Party Compressive Cylinder Breaks
Vehicular Traffic Deck Heavy-duty multi-tier polyurethane traffic membrane with aluminum oxide aggregate ASTM C957 Heavy Vehicular Electronic Spark & Thickness Gauge
“They repaired 18 broken post-tension tendons and overhead beam delaminations while keeping our ground-floor retail parking operational throughout the entire project. John Kraja's technical competence in post-tension concrete is rare in South Florida.”
★
Anthony B. • Commercial Facilities Director Atlantic Horizon Commercial Garage, Delray Beach • Verified 5.0 Google Review

Offering Entire Superior Services Solutions

Single-source general contracting, coastal roofing, and structural restoration engineered for South Florida.

Genti Kraja (John) - Planet Construction Qualifying Contractor

Request Project Estimate for Your Property

Contact our engineering and estimating department to review architectural plans, schedule an on-site structural takeoff, or coordinate municipal permit filings directly with qualifying contractor John Kraja.

Direct Qualifier Contact

Central Office: (754) 301-6747
Official Office Email: office@planetconstructionservices.com
Direct Dispatch: 1500 NE 51st St, Fort Lauderdale, FL 33334

Direct Scope Inquiry Form