CASE STUDY #05 • BUILDING ENVELOPE WATERPROOFING Hollywood, FL

Hollywood Beach Multi-Family Balcony Deck Coating System

Multi-tier pedestrian deck waterproofing and exterior building envelope moisture defense across 36 elevated catwalks and private balconies for an oceanfront multi-family property along Hollywood Beach, eliminating chronic subterranean moisture penetration.

Request Similar Scope Estimate Speak with John: (754) 301-6747
Project Telemetry Data VERIFIED COMPLIANCE
Client Entity Costa Del Sol Multi-Family Oceanfront Residences
Municipal Authority City of Hollywood Building Division
Permit Reference Permit #ENV-2024-06774
Mandate Standard Multi-Family Building Envelope • ASTM C957
Scope Scale 36 Catwalks & Balconies • 9,800 SF
Contract Value – Waterproofing Scope
Supervising Qualifier: John Kraja • CGC1517295 • CCC1329271

The Waterproofing Challenge: Severe Delamination & Unit Water Intrusion

Overlooking the Hollywood Beach Broadwalk, this 3-story coastal residential complex suffered continuous water penetration through exterior elevated walkways into units below.

Years of routine paint maintenance without proper moisture barrier chemistry had trapped hydrostatic pressure beneath previous coatings. Blistered paint allowed rainwater containing airborne sea salts to saturate the concrete slab, creating efflorescence crusting and dripping into ground-floor ceilings.

Furthermore, worn surfaces posed a severe slip-and-fall liability for residents during summer downpours. The property owner needed a monolithic, seamless elastomeric traffic membrane that bridged dynamic structural cracks while meeting strict ADA slip-resistance coefficients.

36
Catwalks Protected
9,800
Square Feet Sealed
>0.45
ADA Slip Resistance DCOF
0
Pinholes on Spark Testing
Pedestrian balcony deck coating and waterproofing in Hollywood Beach
Verified On-Site Construction • Hollywood, FL

The Engineering Execution: Multi-Layer Polyurethane & PMMA Defense

Planet Construction executed a rigorous 5-step preparation and application protocol certified by high-voltage electronic testing.

01

Captive Shot-Blasting & Mechanical Profiling

Diamond grinding and captive blast machines removed existing failed coatings, opening concrete pores to ICRI Concrete Surface Profile (CSP) 3 for maximum molecular bonding.

ICRI CSP-3 Mechanical Prep Standard
02

Two-Component Deep-Penetrating Epoxy Primer

Application of high-solids moisture vapor barrier epoxy primer to suppress concrete outgassing and block hydrostatic pressure up to 15 lbs/1,000 sq ft/24 hrs.

ASTM F1869 Moisture Suppression
03

PMMA Fleece Detailing at Cracks & Perimeter Cants

Perimeter baseboard terminations, door thresholds, and floor drains reinforced with polyester fleece embedded in fast-curing polymethyl methacrylate (PMMA) liquid resin.

Fleece-Reinforced PMMA Waterproofing
04

Elastomeric Polyurethane Traffic Base Membrane

Application of seamless aromatic polyurethane base coat providing 400%+ tensile elongation to bridge dynamic seasonal temperature cracking.

ASTM C957 High-Elongation Membrane
05

Aliphatic UV-Stable Topcoat with Quartz Traction

Application of UV-stable aliphatic polyurethane topcoat broadcasted with washed kiln-dried silica quartz, locking in color and achieving ANSI A137.1 slip resistance.

ANSI A137.1 DCOF > 0.45 • ASTM D5162 Spark Tested

Technical Specifications & Municipal Verification Log

Every material and method deployed adhered strictly to Florida Building Code, manufacturer warranties, and signed engineering calculations.

Scope Parameter Engineered Specification Governing Standard Verification Method
Surface Profile Captive shot-blasting to achieve ICRI Concrete Surface Profile 3 ICRI Technical Guideline 310.2R ICRI Comparator Card Verification
Moisture Vapor Primer 100% Solids two-component epoxy moisture barrier primer ASTM F2170 Relative Humidity Calcium Chloride Test Log
Flashing Detailing Fleece-reinforced PMMA liquid applied resin at all terminations Miami-Dade NOA Approved Visual & Destructive Adhesion Test
Traffic Base Coat High-tensile aromatic polyurethane traffic-bearing membrane ASTM C957 Specification Wet-Film Thickness Mil Gauge Log
Traction & UV Finish Aliphatic UV-stable color-fast topseal with silica quartz aggregate ANSI A137.1 DCOF > 0.42 ASTM D5162 Electronic Spark Test
“Our pedestrian catwalks were leaking into the units below every time it stormed. Planet Construction sealed the entire building envelope and restored the concrete surfaces flawlessly. The textured finish looks modern and eliminated all slip hazards.”
★
Carlos D. • Property Manager Costa Del Sol Multi-Family Oceanfront, Hollywood Beach • Verified 5.0 Google Review

Offering Entire Superior Services Solutions

Single-source general contracting, coastal roofing, and structural restoration engineered for South Florida.

Genti Kraja (John) - Planet Construction Qualifying Contractor

Request Project Estimate for Your Property

Contact our engineering and estimating department to review architectural plans, schedule an on-site structural takeoff, or coordinate municipal permit filings directly with qualifying contractor John Kraja.

Direct Qualifier Contact

Central Office: (754) 301-6747
Official Office Email: office@planetconstructionservices.com
Direct Dispatch: 1500 NE 51st St, Fort Lauderdale, FL 33334

Direct Scope Inquiry Form

Direct submission to our project estimating and engineering department.